Proportion of Human Resources and Material and Equipment Financing in Housing Projects

Authors

  • Mochammad Rico Siswoyo Universitas Muhammadiyah Jember
  • Amri Gunasti Universitas Muhammadiyah Jember
  • Totok Dwi Kuryanto Universitas Muhammadiyah Jember

DOI:

https://doi.org/10.32528/ias.v2i2.466

Keywords:

Human Resources, Material, Equipment

Abstract

Improper distribution of human resources and equipment proportions in a construction project will result in an increase in the cost budget, therefore it is necessary to deepen through research regarding the proportion of construction project resources. This research aims to calculate human and material resources and equipment in housing construction projects using the comparative method. Use of the comparison method to compare the differences in 2 or more groups in different samples. The proportion results for human resources in Grand Permata Kaliurang housing is 19.64 percent and in Diamond City housing 19.88 percent, while the proportion of material resources in Grand Permata Kaliurang housing is 79.21 percent and in Diamond City housing is 78.84 percent and for equipment resources at Grand Permata Kaliurang housing 1.15 percent and for Diamond City housing 1.28 percent.

Downloads

Download data is not yet available.

References

Apdeni, R., Citra, Z., Wibowo, P. D., Malinda, Y., Sipil, T., Teknik, F., Padang, U. N., Sipil, T., Teknik, F., & Buana, U. M. (2022). MENGGUNAKAN APLIKASI JAVA PADA BANGUNAN. 9(3), 400–404.

ASTAWA, I. W. Y., TASTRAWATI, N. K. T., & HARINI, L. P. I. (2020). Waktu Penyelesaian Proyek Konstruksi Menggunakan Precedence Diagram Method Dan Line of Balance. E-Jurnal Matematika, 9(3), 190. https://doi.org/10.24843/mtk.2020.v09.i03.p298

Gudiño León., A. R., Acuña López., R. J., & Terán Torres., V. G. (2021). PERENCANAAN PEN-JADWALAN MENGGUNAKAN METODE LINE OF BALANCE PADA PROYEK PEMBANGUNAN PERPIPAAN AIR LIMBAH KOTA MAKASSAR ZONA BARAT LAUT PAKET C-3. 6.

Gunasti, A. (2017). Penilaian kinerja peladen dan harapan tukang dalam proyek konstruksi. Prosid-ing Sensei, 1–8.

Gunasti, A., Dewi, I. C., & Amartya, A. A. (2021). Porsi Biaya Material Dan Upah Serta Peralatan Pada Pekerjaan Struktur Jembatan Portion Of Material Costs And Wages And Equipment In Bridge Structure Work. 58–68.

Gunasti, A., & Fadah, I. (2019). Competence enhancement strategy at uncertified builders group, pringtali village, jember. International Journal of Scientific and Technology Research, 8(12), 2963–2969.

Gunasti, A., Zakiyyah, A. M., Maris, A., & Yulisetiarini, D. (2020). Builders performance improve-ment with briefing in Jember. International Journal of Scientific and Technology Research, 9(2), 1339–1347.

Hani, B. (2019). Prediksi Slippage menggunakan Metode Regresi. Ultimatics, 10(2), 73–77. https://doi.org/10.31937/ti.v10i2.940

Muzayanah, Y. (2008). Pemodelan Proporsi Sumber Daya Proyek Konstruksi. Tesis Magister Teknik Sipil Universitas Diponegoro, Semarang, 1–160. https://core.ac.uk/download/pdf/11717058.pdf

Sdm, P. P., Dan, M., Pada, A., Utari, R. P., & Setyono, E. (n.d.). 60 Permodelan Proporsi SDM, Ma-terial Dan Alat Pada Proyek Konstruksi Gedung Sederhana _ Non Sederhana.pdf. 1–8.

Suwinardi, S. (2015). Penjadwalan Dan Pengembangan Rencana Proyek. Orbith: Majalah Ilmiah Pengembangan Rekayasa …, 11(3), 223–229.

Teknologi, J. S., Perbandingan, S., Biaya, P., Daya, S., Berdasarkan, K., Rehabilitasi, P. T., Arifin, Z., Gunasti, A., & Kuryanto, T. D. (2023). Abstrak. 1, 1–11.

Fahan, T. (2005). Analisis Efisiensi Penggunaan Alat Berat. Universitas Islam Indonesia. Yogyakarta.

Downloads

Published

2023-07-30

How to Cite

Siswoyo, M. R., Gunasti, A. ., & Kuryanto, T. D. . (2023). Proportion of Human Resources and Material and Equipment Financing in Housing Projects. International Applied Science, 2(2), 59–64. https://doi.org/10.32528/ias.v2i2.466